PFAS-contaminated groundwater at a former tannery in northeast Michigan ranged from 4,499 ppt (PZ-1C) to 7,193 ppt total PFAS (EW-2) in silty sands from 2–8 feet below ground surface. A pilot study was required to demonstrate treatment effectiveness and evaluate long-term concentration sustainability before full-scale remediation.
BAM Ultra was injected through 46 DPT locations using 4,445 gallons of treatment solution, covering the source area (EW-2, PZ-1) and providing downgradient monitoring coverage (PZ-1C). Long-term groundwater monitoring was conducted over three years to assess treatment durability.
Within one week of BAM Ultra injection, PFOS concentrations were reduced 94% and PFOA 92% at the former tannery in northeast Michigan. At one year post-treatment, greater than 99% total PFAS reduction was confirmed with near non-detect results across source area monitoring points. Three years post-treatment, 86% reduction was maintained at EW-2, and continued improvements were observed at the downgradient monitoring point PZ-1C—demonstrating durable long-term performance of the BAM Ultra treatment across the 2–8 ft depth silty sand interval. The 46-point DPT injection program covering both the source area and downgradient monitoring zones was validated by the three-year monitoring dataset.
Superfund ISTR Under Strict Air Emission Limits
Bioremediation for PFAS
High-Profile ISTR of Historic Chemical Disposal Impacts
Explore real-world remediation projects where VIYA’s technology-agnostic approach, field expertise, and integrated treatment strategies have been applied to complex site conditions. Browse case studies by contaminant, technology, industry, and project type to see how tailored solutions translate into measurable results.